Skip to product information
1 of 7

Vesgantti

Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Mattress in a Box, Pressure Relief Pocket Spring Twin Size Mattress with Memory Foam & Breathable Knitted Fabric, Medium Firm, CertiPUR-US

Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Mattress in a Box, Pressure Relief Pocket Spring Twin Size Mattress with Memory Foam & Breathable Knitted Fabric, Medium Firm, CertiPUR-US

Regular price $214.48 USD
Regular price Sale price $214.48 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • 【Medium Firm Feel】Twin foam mattress are fully expanded 75*39*10 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm of twin size mattresses provide medium firm yet comfortable feel which will protect and support your lumbar vertebra and back from pain. Boxed colchones twin mattress fits most bedframe types except adjustable bed frame.
  • 【Individual Pocket Spring】This twin bed mattress has innovative 7-zoned spring support system with ergonomic design that is constructed by hundreds of individual pocketed stainless spring coils. Each spring of mattress twin size work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture.
  • 【Breathable and Healthy】This twin hybrid mattress is designed with multi-layer foams and pocket spring which increasing good air circulation and breathability. It keeps body comfortable and dry and provides a cooler sleeping environment. This mattress contains no fiberglass, which means a healthier sleep environment.
  • 【Motion Isolation & Ultra Quite】Due to the pocket spring and multilayer foams design of foam mattress twin, this innerspring mattress can effectively absorb noise and vibration. So you won’t be disturbed by any tossing and turning from your partner and enjoy a peaceful and comfortable sleep. This twin bed mattress can support weight up to 250 lbs.
  • 【Mattress in a Box】Our 10 inch twin mattress is compressed, rolled, and shipped in a box for ultimate convenient delivery to your door. For a better sleeping experience, please wait 72 hours for the mattress to fully expand. You can contact the Vesgantti support team if you have any problems. (Cautions: Make sure no one is standing at the direction where the mattress is rolling out to prevent any unnecessary injury. Once the mattress is opened and expanded, it cannot be rolled back again.)

Overview

  • Brand : Vesgantti
  • Size : Twin
  • Product Dimensions : 75"L x 39"W x 10"Th
  • Top Style : Euro Top
  • Cover Material : Breathable Knit Fabrics
  • Fill Material : Memory Foam
  • Weight Limit : 250 Pounds
  • Special Feature : Low Motion Transfer
  • Color : Grey
  • Coil Type : Pocketed Coil
  • Item Weight 20 Kilograms : Item Firmness Description Medium Firm
  • : Item Weight 20 Kilograms
  • : Item Firmness Description Medium Firm
View full details